Home Pier Model 2
Lat: N 32º 40'39.2",
Long: W 097º 08"40.8"
Below are images of my second pier
under construction. This one features 5/8" Aluminum plate,
1/2" 13TPI steel treaded rod throughout.
I started by drilling 4 mounting holes in the bottom plate to mount it to
the concrete outside and 4 inner holes for the treaded rods held in place
by 1/2 bolts top and bottom. After it was test fitted it was mounted
outside and the Sonotube filled with Maximizer concrete and allowed to
setup for 7 days before any testing was done.
|
|
Here is the bottom
plate drilled and rod fitted for testing.
|
Here you can see the top plate and level plate
|
And here is a top view showing it fully assembled
|
|
|
|
|
|
A better view, Note the Distance between the top plate
and leveling plate is only for the test fit.
|
Yet another view
|
|
|
Heres the New pier in place in the
back yard
|
and from the side
|
|
|
|
|
and a closeup of the Wedge on the
Pier
|
|
|
|
|