Resource Guide Employee Self Service | HR Home | home.aafes.com


Constructing Genesis
Testing the Electronics
My Genesis Camera   Genesis Manual   The Parts Kit   The Lower Card  The Upper Card   Testing  Case Assembly   Case Assembly 2   First Light  Users


It's time to begin setting the Voltage levels and Testing the Boards
In this image you can see the Last voltage being set. Everything worked by the book and the voltages  were very easy to set.

At this point the CCD has been installed and 2 images taken and subtract as per the manual.  The STD Dev on mine was at 11.3.  Night Vision mode was turned on
Same Processing without Night Vision
This was the actual images from the SAVE A        
This was the Image from the SAVE B

And this is the images after issuing the 
SUB A 1000
VISU 1200 800 commands